Ornatec International
EN
Start Enquiry

Method Statement: Exporting Four Thousand Palms to Dubai

Method Statement: Exporting Four Thousand Palms to Dubai

Ornatec International |

Archive record · Export method statement · 2000s · Dubai, UAE

This record rebuilds a working export method statement prepared for one of Dubai's landmark hotel developments: a tender to supply over four thousand palms, delivered CIF Jebel Ali, for the international hospitality group behind some of the emirate's most famous resorts. It is the document our July article on palm export to Dubai drew from; here is the fuller professional detail.

Scope of works, as written

  • Source and supply palm species to the specifications of the plant schedule.
  • Apply best practice in transplanting palms from their place of origin.
  • Transport palms from origin to a controlled holding area for processing.
  • Prepare palms for export so a phytosanitary certificate can be granted, including removal of native soil and replacement with soil-less media.
  • Prepare palms for shipping to withstand the rigours of ocean freight.
  • Advise the client on post-entry establishment care.

The technical spine

Sourcing: specified palms drawn from supply sources across Thailand, Malaysia, Singapore, China and Australia, chosen partly because year-round warmth in most of those origins keeps root growth active, allowing transplant works in any month.

Specification: supply measured against clear trunk height, defined precisely as base of trunk to the base of the first frond, with a diagram in the original so no supplier or inspector could interpret it differently.

Transplanting: canopy reduced by one half to two thirds at digging depending on species to control transpiration loss; for sensitive species such as Sabal palmetto, all fronds removed except a protective tie around the apical bud; anti-transpirant treatment applied through the process.

Phytosanitary preparation: native soil washed out and replaced with sterile soil-less media in the holding area, making certification possible while giving palms a recovery period to regenerate feeder roots before the voyage.

Why this record matters

Method statements are where expertise stops being a claim and becomes a procedure. This one, drawing on what was then fifteen years of international plant supply, shows the discipline behind every palm avenue the team has delivered since: specification you can measure, preparation you can inspect, and aftercare planned before departure. The same method, matured by two more decades of projects, underpins our current export and delivery capability.

Continue in the Knowledge Archive.

Previous Next